Water Line Installation History

.

.

             The BLUE (001) designates water lines that have been installed in the Commission District (001).

               The RED (002) designates water lines that have been installed in the Commission District (002).

 

.

2004-2006

.

.

Contractor Installed

 .

Cove Road

(002) 

Cowart Mtn. Road

(002)

Eagles Perch Road

(002)

Hwy. 53 East

(002)

Lawson Federal Road

(002)

Lovelady Roa

(002)

Mclain Mtn. Road

(002)

Total Contractor Installed-155,495 Ft.

.

.

.

.

Pickens County Installed

.

June 2005


  Constructed a 1,000,000 gallon Water Tank off of Churchyard Road  (001)

.

.

2006

.

.  Constructed a 500,000 gallon Water Tank off of Cove Road  (002)

.

.

.

2007 Water Main Installation

Road Name              Size                 Length           Completed

Duckett and FortnerRoads

6”

2700’

12-07

(002)

Harrington and Hwy 53

8”

7400’

12-07

(002)

2007    Total – 10,100 Ft.

.

July 2008

.

Constructed a 500,000 gallon Water Tank off of Worley Crossroads (001)

.

.

    2008 Water Main Installation

Road Name              Size                 Length           Completed

Long Swamp

8”

1200’

2-08

 (002)

Poole

6”

1700’

3-08

(002)

Thomason

6”

3150’

3-08

 (001)

Long

6”

4375’

4-08

(001)

Carlan and Moss Roads

8”

3350’

4-08

(001)

High Knoll and Snaffle Bit Roads

6”

6830’

4-08

 (002)

Adams

6″

2200’

8-08

 (001)

Big Ridge

6”

9000’

8-08

(001)

Partain

8”

3200’

8-08

(002)

Pendley Woods

6”

2000’

8-08

 (002)

Moore

6”

1700′

9-08

 (001)

Cowart

8”

6500’

11-08

(002)

Fitts

8”

9500’

12-08

 (002)

Marble City

6”

1700’

12-08

(002)

2008   Total – 56,405 ft.

.

.

.

2009 Water Main Installation

 .

Road Name              Size                 Length           Completed

Bruce

8”

1800’

1-09

(002)

Dank

6”

1700’

1-09

 (002)

Moore Rd

6”

2600’

3-09

(001)

Arbor Hill Ch.

6”

1000’

6-09

(001)

Mathews and Hill City Roads

6”

4000’

6-09

(001)

Carver Mill and Bethel Roads

8”

11,400’

11-09

 (001)

Blacknob Church and Damascus Roads

8”

18,500’

12-09

 (001)

2009    Total – 41,000 ft.

.

.

.

 2010 Water Main Installation

.

 Road Name              Size                 Length           Completed

Family Acres

8”

1000’

3-10

(001)

Ollie Long

6”

1280’

3-10

(001)

2010    Total – 2280 Ft.

.

.

 

 

2011 Water Main Installation

.

Road Name              Size                 Length           Completed

Head Start Rd

6”

3500’

3-11

(002)

New Town St

8”

1500’

5-11

(002)

Comm.Building

6”

400’

5-11

 

Roper Park

8”

600’

6-11

 

Emma Dr

6”

400’

7-11

(001)

2011    Total – 6400 Ft.

.

.

2011

Constructed a 500,000 gallon Water Tank off of Worley Crossroads (001)

.

.

2012 Water Main Installation

.

Road Name              Size                 Length           Completed

Family Acres

6”

1000’

1-12

  (001)

Green Hill

6”

7000’

 (001)

Reavis Rd

6”

1600’

 (002)

2012    Total to Date – 9600 Ft.

.

.

Total County Installed-125,785 Ft.

.

.

 Total Installed 2004-2011

 .

281,280 Ft.      (53.12 Miles)

 .

Cost Estimate $4,207,200.00